Quality Control

  Analytical balance

 HPLC

 UV- vis Spectrophotometer

 FTIR

 Flame Photometer

 Karl Fisher Apparatus

 pH meter

 Conductivity meter

 Digital Polarimeter

 Potentiometric Tiltrator

 Liquid particle counter

 Air Particle counter

 Total organic carbon (TOC) analyser

 Muffle furnace

 Hot air oven

 Vacuum oven

 Digital Melting point apparatus

 Sonicator

 Bursting strength testing machine

 Digital Vernier calliper

 Hot plate

 Magnetic stirrer

 Refrigerators

 Desiccators

 Stability chambers

 Eye/ Body shower

 Sampling tools

 UV cabinet for TLC

 Oil free Vacuum pumps

 Laminar Air Flow

 Filtration flasks

 Manifold Filtration Assemblies

 Autoclaves

 Flat bottom pH meter

 Heating block

 Colony counter

 BOD incubators

 Microbial Air Sampler

 Vortex mixture

 Fogger

 Microscope

 Bio- Safety Cabinet

Validation and Calibration

Critical equipments like weighing scales etc. are calibrated daily before the start of production activities. The laboratory equipments are calibrated / qualified / revalidated on a regular basis from time to time as per standard procedures and records maintained.

Process validation is done for every product for the first three batches by analyzing the bulk solution for thorough mixing or as the case may be.

Cleaning and Sanitation procedures of manufacturing areas and equipments are in place.

Standard cleaning procedures for equipment and areas are written and displayed.

Disinfecting agents for floors and walls are used alternatively every week.

The method of evaluating the effectiveness of cleaning is by microbial evaluation.

Microbiological methods like swab testing are carried out to monitor the efficiency of cleaning methods in critical areas like dispensing, processing areas etc.

Cleaning method for the water supply system: Overhead tank storing raw water is cleaned with disinfectants as per schedule.

Cleaning of Air Handling System Pre Filters

The pre filters of AHUs are removed for cleaning and are refitted with spare pre-fiilters. The cleaned pre-filters are then stored at appropriate place.